WorkSafe Certified

Post-Construction Cleaning Checklist for Melbourne Builders

Complete move-in ready cleaning standards. Building Code compliance, WorkSafe certified processes, and guaranteed handover excellence for Melbourne construction projects.

18 min read
25 January 2025
Twenty Two Systems Team

Three Critical Cleaning Phases

Professional post-construction cleaning follows a systematic three-phase approach

1

Rough Clean

During Construction

  • β€’ Debris removal and waste management
  • β€’ Dust control and surface protection
  • β€’ Safety hazard elimination
  • β€’ Basic site maintenance
2

Builder's Clean

Pre-Final Inspection

  • β€’ Comprehensive interior cleaning
  • β€’ Window and fixture cleaning
  • β€’ Surface preparation for final touches
  • β€’ Safety compliance verification
3

Final Detail Clean

Move-in Ready

  • β€’ Premium cleaning for occupancy
  • β€’ Touch-up and perfection work
  • β€’ Final quality assurance
  • β€’ Client handover preparation

Pre-Cleaning Safety Assessment

Essential safety evaluation checklist before commencing cleaning operations

Safety Evaluation Checklist

Structural integrity verification - All construction work completed
Electrical systems safety - Power supply tested and certified
Water systems functionality - Plumbing tested and operational
HVAC system operation - Heating, ventilation, and air conditioning functional
Fire safety systems - Alarms, sprinklers, and exits tested
Hazardous material identification - Asbestos, lead, chemicals located
Access and egress routes - Safe pathways established
Personal protective equipment - Appropriate PPE available

Phase 2: Builder's Clean Checklist

Comprehensive interior cleaning before final inspection

Floors and Surfaces

Hard Flooring:

  • Remove all construction debris and adhesive residue
  • Sweep and vacuum all floor surfaces thoroughly
  • Mop with appropriate cleaning solutions
  • Remove paint spills and stains
  • Apply protective coatings if specified
  • Clean and polish natural stone surfaces
  • Grout cleaning and sealing (tiles)

Carpeted Areas:

  • Vacuum all carpet and upholstery thoroughly
  • Steam clean carpets with commercial equipment
  • Treat stains and high-traffic areas
  • Apply carpet protection treatments
  • Clean carpet edges and corners
  • Remove installation debris from padding

Windows and Glass

Interior Glass Cleaning:

  • Remove protective films and construction residue
  • Clean glass surfaces with streak-free solutions
  • Polish mirrors and decorative glass
  • Clean window tracks and hardware
  • Inspect and clean between double-pane glass
  • Clean glass partitions and doors

Exterior Window Cleaning:

  • Remove construction dust and debris
  • Clean exterior glass surfaces
  • Polish window frames and hardware
  • Clear window wells and drainage
  • Clean exterior lighting through glass
  • Pressure wash exterior glass features

Phase 3: White Glove Standards

Premium quality standards for move-in ready condition

Zero Tolerance for Dust

All surfaces completely dust-free

Streak-Free Glass

All windows and mirrors perfectly clear

Spotless Fixtures

All plumbing and lighting fixtures pristine

Fresh Air Quality

No construction odors or dust particles

Perfect Floors

All flooring surfaces clean and protected

Sanitized Surfaces

All high-touch areas disinfected

Professional Post-Construction Cleaning

Twenty Two Systems delivers exceptional post-construction cleaning for Melbourne builders. Our WorkSafe certified teams ensure move-in ready standards that exceed client expectations and protect your professional reputation.

Melbourne Market Rates (2025)

Basic Builder's Clean:

$3-6 per mΒ²

Premium Detail Clean:

$6-12 per mΒ²

Free on-site assessment with detailed quote and timeline for your construction project

Call Now
1300 728 617